A significant project in the future delivery of office space to the eastern Robina precinct in Gold Coast
, ADC sought and obtained approval for the Material Change of Use (MCU). The site was vacant and approval was obtained for over 2,000m2 of Gross Floor Area (GFA) despite the existence of significant (although occupied) office space in the precinct and despite the Planning Scheme prescribing this figure of 2,000m2 GFA as the maximum permissible for the entire precinct.